Costs & Budgeting

What Drives Single Storey Extension Cost

A single storey extension looks simple from the garden. Most of its cost is in things you will never see again once it is finished: the ground under it, the structure holding the old house up where the wall used to be, and the services buried in it. Knowing that changes how you read a quote.

What is under the ground

Foundations are the least predictable element of any extension, and the one no honest builder can fix before knowing the site. Clay subsoil with mature trees nearby means deeper foundations. A drain crossing the footprint means either a diversion or a bridging detail agreed with the water authority.

Sloping ground means retaining and more spoil to remove. None of these are optional, and all of them are decided by the site rather than the design.

  • Soil type and depth to bearing stratum
  • Trees on or near the boundary and their species
  • Existing drainage runs and manholes within the footprint
  • Access for muck away and materials, which drives labour hours
  • Level changes across the plot

Opening up the back of the house

The moment that makes an extension feel like one is the removal of the original rear wall. That is a structural operation: steel beams sized by an engineer, padstones, temporary propping and often a goalpost frame where a corner is opened.

The wider the opening and the more of the wall that goes, the heavier the steel and the more involved the installation. A full width opening with no down stand is a very different price to a wide doorway, and it is worth being clear which you are pricing.

Glazing, the visible variable

Glazing is where budgets are made and lost. A pair of french doors and a window is one thing. A run of bifolds or a large sliding door with slim sightlines and a structural rooflight above is quite another, and the difference can be a substantial share of the whole project.

It is also the decision that most changes how the room feels, so it deserves deliberate attention rather than being trimmed at the end when the money is short.

What is inside it

An empty shell is a fraction of the finished project. Most single storey rear extensions are kitchens, and the kitchen, appliances, worktops, flooring, underfloor heating, lighting and decoration are often close to the cost of the building work itself.

Treat the fit out as its own budget line from the start. Extensions that run over almost always do so on the inside rather than the outside.

The efficiency of size

Cost per square metre falls as the extension grows, up to a point. The expensive parts, the structural opening, the foundations reaching the bearing stratum, the drainage connection, the site setup, are largely fixed regardless of whether you build three metres or four.

That is why an extra metre of depth frequently costs far less proportionally than the first three, and why it is worth pricing two sizes rather than assuming the smaller one is the sensible saving.

Want a professional to handle it?

Request your free, no-obligation quote through our enquiry form — it takes under two minutes and goes straight to Elliot.

Request my free quote

You'll be taken to our secure TradeHQ enquiry form. We reply within 48 hours. Prefer to talk? Call 07850 357962.

Frequently asked questions

Talk it through before you spend anything

Ask us to price two depths on the same design. Seeing the marginal cost of the extra metre often changes the decision.

Related services

Covering Kent, East Sussex & Surrey.

Related pages

More guides

Browse all building and renovation guides